Ozzi Building Inspections - Products

Products

The final pre-handover inspection is also called the PCI (Practical Completion Inspection) report in which the inspection team provides a complete detailed document about physical structural analysis, overall condition, and strength of the property.


Frame / Pre-plaster inspection is the step just after completion of wall and room framing. In case if the building is multiple stories, then the garage area or other lower areas are not required to be finished at the frame stage.


Slab inspection is an important stage in house building process. Ozzi Building Inspections team will identify any issues with the construction of your slab.


Ozzi Building Inspections team will identify any issues with the construction of your Pre-pour or Steel. Serious errors in steel or pre-pour can have disastrous effects on your property, both short term and long term, and can often go unnoticed for years until they become extremely expensive and stressful to fix.


Complete Stage Inspections Package by Ozzi Building Inspections includes all 5 stage inspections of new home building inspections: 1- pre-pour or steel insepctions, 2- slab insepctions, 3- frame or pre-plaster inspection, 4- lockup stage inspection, 5- final handover inspection.